Super Lowest Price 450 Case Dozer Front Idler - Excavator undercarriage part front idler Komatsu PC200-3 made in china – Heli
Super Lowest Price 450 Case Dozer Front Idler - Excavator undercarriage part front idler Komatsu PC200-3 made in china – Heli Detail:
Idler shell material:ZG40Mn
Surface hardness:HRC48-58
Quench depth:>4mm
Shaft material:45#
Surface hardness:HRC48-58
Quench depth:>2.5mm
Idler support material:QT450-10/ZG35
Weight:143kg
Installation size:280mm,65mm
What is idler?
The function of an idler is to guide the track links into running smoothly and to prevent dislocation. Idlers also carry some weight and therefore increasing the track links and decreasing ground pressure.There is also an arm in the center which supports the track link and guides the two sides . The smaller the distance bet ween the idler and track roller,the better the orientation.
Why choose us?
We are a real manufacturer, we have a complete production line, from rough casting to finished products, So we can deliver on time and provide the best cost-effective products. And we also use advanced heat treatment equipment to provide a stable heat treatment process to ensure the stability of product quality. So choosing us is your wisest choice.
|
IDLER |
|||||||||
|
KOMATSU |
PC40 |
HITACHI |
EX360-5G |
HYUNDAY |
R225-7 |
VOLVO |
EC460/480 |
LIUGONG |
LIUGONG948/950 |
|
|
PC55/56 |
|
EX400 |
|
R265-7/R265 |
|
VOL700 |
|
LIUGONG970 |
|
|
PC60/PC60-5 |
|
ZAX450 |
|
R290 |
|
JONGYANG200-3/5/ZY230 |
|
HD250 |
|
|
PC90 |
|
EX550/ZAX650 |
|
R305/ |
|
JONGYANG300 |
|
HD450 |
|
|
PC100/PC120 |
|
ZAX670 |
|
R450 |
|
SUNWARD50 |
|
HD700/820/1023 |
|
|
PC200-3 |
|
EX800 |
|
R485505520 |
|
SUNWARD70/60 |
|
HD1250/HD1430 |
|
|
PC200-5/7/SY215 |
|
ZAX870 |
|
R974 |
|
KUBOTA50/60/161 |
|
ZOOMLION280 |
|
|
PC200 |
|
ZAX870 |
DOOSAN |
DH55 |
|
KUBOTA85/185 |
|
ZOOMLION230 |
|
|
PC240-8 |
KOBELCO |
SK55 |
|
DX60 |
|
TAKEUCHI150/160 |
|
XCMG700 |
|
|
PC300-5/PC360/-7 |
|
SK60/SK75 |
|
DH80 |
|
TAKEUCHI175 |
SY |
65 |
|
|
PC360-8 |
|
SK60-8 |
|
DX75/80 |
|
TAKEUCHI185 |
|
ZY200 |
|
|
PC400 |
|
SK100/SK140 |
|
DX140/150 |
|
RAY WALTER60 |
|
ZY300 |
|
|
PC600-5 |
|
SK200/SK230 |
|
DH130/150 |
|
RAY WALTER85 |
|
XCMG280 |
|
|
PC650-8 |
|
SK220 |
|
DH220 |
|
YANMAN55 |
|
924 |
|
|
PC750/800 |
|
SK270 |
|
DX200/DX260 |
|
YANMAN75 |
|
806 |
|
|
PC1250 |
|
SK330/SK350/SK360 |
|
DH258 |
CASE |
CX55 |
|
85/E6085 |
|
CAT |
E55/E305.5/E306 |
|
SK330-8 |
|
DX300 |
|
CX75 |
|
Ishikawa island100 |
|
|
E70B/E307 |
|
SK450 |
|
DH280/300 |
|
CX135 |
|
100 |
|
|
E120B/312 |
|
SK850 |
|
DH360/DH420 |
|
CX240 |
||
|
|
E200B/E320 |
SUMITOMO |
SH60 |
|
DH370-9 |
|
CX350 |
||
|
|
E324 |
|
SH120 |
|
DX380 |
LIEBHERR |
LIEBHERR914/924/916 |
||
|
|
E325/325 |
|
SH120A3 |
|
DX480/500 |
|
LIEBHERR934 |
||
|
|
E330 |
|
SH200/280/210/240 |
|
DH500 |
|
R944 |
||
|
|
E345 |
|
SH220 |
YUCHAI |
CY35 |
JCB |
JCB220(280×80) |
||
|
|
E365D |
|
SH240 |
|
YC60 |
|
JCB220(280×90) |
||
|
|
E375/385/390 |
|
SH300/A3 |
|
CY85 |
|
JCB240 |
||
|
HITACHI |
ZAX55/EX55/ZAX60 |
|
SH350 |
|
CY18 |
|
JCB290 |
||
|
|
EX60-2 |
|
SH360 |
|
YC135 |
|
JCB360/370 |
||
|
|
ZAX70 |
|
SH400/460 |
VOLOV |
EC55B |
LIUGONG |
LIUGONG906 |
||
|
|
EX100 |
|
SH450 |
|
EC80 |
|
LIUGONG906E |
||
|
|
EX200-2 |
HYUNDAY |
R55 |
|
EC140 |
|
LIUGONG908 |
||
|
|
EAX200/ |
|
R60/Ishikawa island60/LG60/-5 |
|
EC210/240 |
|
LIUGONG908E |
||
|
|
ZAX200-5G |
|
R80 |
|
EC290 |
|
LIUGONG915 |
||
|
|
EX300-1 |
|
R130/R150-9 |
|
VOL290 |
|
LIUGONG925 |
||
|
|
EX300-5 |
|
R200/R210 |
|
EC360 |
|
LIUGONG933/936 |
||
Product detail pictures:
Related Product Guide:
Innovation, excellent and reliability are the core values of our business. These principles today extra than ever form the basis of our success as an internationally active mid-size company for Super Lowest Price 450 Case Dozer Front Idler - Excavator undercarriage part front idler Komatsu PC200-3 made in china – Heli , The product will supply to all over the world, such as: Monaco, panama, Rotterdam, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.




