Manufacturer for Upper Supporting Roller - pc200-8 excavator assembly top carrier roller 1 buyer – Heli
Manufacturer for Upper Supporting Roller - pc200-8 excavator assembly top carrier roller 1 buyer – Heli Detail:
pc200-8 excavator assembly top carrier roller 1 buyer
| BRAND | CATALOGUE | ||||||||
| BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
| D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
| D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
| D7G | D8K | D8N | D9N | D10N | D11N | ||||
| KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
| PC220 | PC300 | PC350 | PC400 | ||||||
| CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
| E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
| HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
| EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
| FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
| VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
| DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
| HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
| KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
| KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
| SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
| JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
| JS240 | JS260 | JS300 | JS330 | ||||||
| SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
| SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
| MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
| MITSUBISHI | MS110 | MS120 | MS140 | MS180 | |||||
FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours.
2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20’ full container and LCL container (less than a container load) can be acceptable.
5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.
6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Product detail pictures:
Related Product Guide:
"Based on domestic market and expand overseas business" is our development strategy for Manufacturer for Upper Supporting Roller - pc200-8 excavator assembly top carrier roller 1 buyer – Heli , The product will supply to all over the world, such as: Czech, Zimbabwe, Buenos Aires, Look forward to the future, we will focus more on the brand building and promotion . And in the process of our brand global strategic layout we welcome more and more partners join us, work together with us based on mutual benefit. Let's develop market by fully utilizing our comprehensive advantages and strive for building.
We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.












