Fast delivery D7g Carrier Roller – PC200-8 Excavator Assembly Top Carrier Roller – Heli
Fast delivery D7g Carrier Roller – PC200-8 Excavator Assembly Top Carrier Roller – Heli Detail:
PC200-8 Excavator Assembly Top Carrier Roller
Part Number
| BRAND | CATALOGUE | ||||||||
| BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
| D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
| D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
| D7G | D8K | D8N | D9N | D10N | D11N | ||||
| KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
| PC220 | PC300 | PC350 | PC400 | ||||||
| CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
| E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
| HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
| EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
| FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
| VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
| DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
| HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
| KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
| KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
| SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
| JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
| JS240 | JS260 | JS300 | JS330 | ||||||
| SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
| SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
| MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
| MITSUBISHI | MS110 | MS120 | MS140 | MS180 | |||||
FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours.
2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20′ full container and LCL container (less than a container load) can be acceptable.
5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.
6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Product detail pictures:
Related Product Guide:
Bear "Customer initially, High-quality first" in mind, we work closely with our prospects and supply them with efficient and specialist companies for Fast delivery D7g Carrier Roller – PC200-8 Excavator Assembly Top Carrier Roller – Heli , The product will supply to all over the world, such as: Montreal, Swansea, Porto, Our items have been obtained more and more recognition from foreign clients, and established long term and cooperative relationship with them. We`ll supply the best service for every customer and sincerely welcome friends to work with us and establish the mutual benefit together.
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!













