WhatsApp Online Chat !

HYUNDAI-R210-7(81N6-26600)Track Link Chain Assembly/Heli-CQC Track supply OEM quality excavator undercarriage parts

Short Description:

Short Description

model R210-7
part number 81N6-26600
Technique Forging
Surface Hardness HRC50-56Depth10-12mm
Colors Yellow
Warranty Time 2000 Working Hours
Certification IS09001
Weight 570KG
FOB Price FOB Xiamen port US$ 25-100/Piece
Delivery Time Within 20 days after contract established
Payment Term T/T,L/C,WESTERN UNION
OEM/ODM Acceptable
Type crawler excavator undercarriage parts
Moving Type Crawler excavator
After-sales Service Provided Video technical support, Online support


Product Detail

Product Tags

R210-7 Track Link ass'y

1. Key Specifications & Compatibility

  • Part Number: 81N6-26600
  • Application: Hyundai R210-7 crawler excavator (mid-size class, ~21 tons).
  • Assembly Includes:
    • Track links (left/right chains)
    • Pins, bushings, and seals (often pre-assembled)
  • Material: Forged alloy steel, hardened for abrasion resistance.
  • Lubrication Type: Typically SALT (Sealed and Lubricated Track) or dry.
  • Pitch: ~216 mm (standard for R210-7).

⚠️ Critical Check:

  • Verify compatibility with your excavator’s serial number range (e.g., HXG-, HXM- prefixes). Hyundai often revises parts between production batches.

2. Where to Buy (OEM & Aftermarket)

OEM Sources:

  • Hyundai Dealers:
    • www.cqctrack.com
    • Local dealers (use Hyundai’s dealer locator).
  • Price Range: $1,800–$2,500 per side (new).

Quality Aftermarket Alternatives:

  • Berco (ITR Group): Compatible assemblies under their catalog.
  • Prowell (Korea): Direct OEM-equivalent supplier.
  • VemaTrack (Global): Budget-friendly option.

Online Marketplaces:

  • Specialized:
    • www.cqctrack.com
  • General: eBay, Amazon Industrial (search “81N6-26600 track chain”).

3. Installation & Maintenance Tips

  • Replacement Signs:
    • Elongation >3% (measure pin/bushing wear).
    • Visible cracks, broken links, or severe bushing wear.
  • Tools Needed: Track press, sledgehammer, tension gauge.
  • Critical Steps:
    1. Release track tension.
    2. Remove master pin/link.
    3. Press new assembly into place.
    4. Adjust tension to spec (check operator’s manual).





  • Previous:
  • Next:

  • Write your message here and send it to us