Manufacturer for Upper Supporting Roller - pc200-8 excavator assembly top carrier roller 1 buyer – Heli
Manufacturer for Upper Supporting Roller - pc200-8 excavator assembly top carrier roller 1 buyer – Heli Detail:
pc200-8 excavator assembly top carrier roller 1 buyer
BRAND | CATALOGUE | ||||||||
BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
D7G | D8K | D8N | D9N | D10N | D11N | ||||
KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
PC220 | PC300 | PC350 | PC400 | ||||||
CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
JS240 | JS260 | JS300 | JS330 | ||||||
SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
MITSUBISHI | MS110 | MS120 | MS140 | MS180 |
FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours.
2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20’ full container and LCL container (less than a container load) can be acceptable.
5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.
6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Product detail pictures:





Related Product Guide:
With a complete scientific quality management system, good quality and good faith, we win good reputation and occupied this field for Manufacturer for Upper Supporting Roller - pc200-8 excavator assembly top carrier roller 1 buyer – Heli , The product will supply to all over the world, such as: Sheffield, Belgium, London, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We now have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.

It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
