2021 China New Design Pc200-7 Carrier Roller - Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller – Heli
2021 China New Design Pc200-7 Carrier Roller - Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller – Heli Detail:
Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller
Part Number
BRAND | CATALOGUE | ||||||||
BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
D7G | D8K | D8N | D9N | D10N | D11N | ||||
KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
PC220 | PC300 | PC350 | PC400 | ||||||
CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
JS240 | JS260 | JS300 | JS330 | ||||||
SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
MITSUBISHI | MS110 | MS120 | MS140 | MS180 |
FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours.
2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20’ full container and LCL container (less than a container load) can be acceptable.
5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.
6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Product detail pictures:







Related Product Guide:
We also offer product sourcing and flight consolidation services. We've got our personal factory and sourcing office. We can easily present you with almost every style of merchandise linked to our merchandise range for 2021 China New Design Pc200-7 Carrier Roller - Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller – Heli , The product will supply to all over the world, such as: Netherlands, New Delhi, Hongkong, With more and more Chinese products around the world, our international business is developing rapidly and economic indicators big increase year by year. We have enough confidence to offer you both better products and service, because we are more and more powerful, professional and experience in domestic and international.

The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
